This end-to-end test, of course, depends on the tools, provided
inside the test's working directory. The test, being end to end,
constructs a workspace with multi-repository configuration with
the main repo a file repsoitory at the root of the constructed
work space; to be able to test exporting this repository has pragma
"to_git". Move the constructed work space to sub directory to not
include the tools to be tested in the work space that is gitified;
one the one hand, the tested tools should not be part of the test
workspace and on the other hand, this shaves off a large fraction
of the test's run time.
|
|
This allows better separation and, in particular, repositories
needed only for tests do not have to be provided for building the
tools. This also better documents which dependencies are only needed
for testing.
|
|
... and, in particular, do not read any rc files for just-mr
the user might have.
|
|
|
|
|
|
|
|
Run build and garbage collection end to end and verify two basic
properties.
- A target used after the the last gc is still available after
another gc, and so are all its parts, even if the output is a
single tree.
- A target not used between to gc is purged from disk and disk
space is not used any more.
|